Nottingdale Village – London

Recycling / Strip Outs / decoonstruction / Asbestos Removal

Warning: extract() expects parameter 1 to be array, string given in /var/sites/m/metrodeconstruction.com/public_html/wp-content/themes/visia/framework/php/PeTheme/ShortCode/PeThemeShortcodeBS_Columns.php on line 55

Job Summary

  • Value          £248,500.00
  • Duration    14 Weeks
  • Location    Central London

Description

Metro was the Principal Contractor for the demolition phase of this project, which included the pre demolition strip out, asbestos removal and machine demolition of the buildings. We lifted all slabs and foundations and crushed stockpile on site for use during construction.

Results

- Zero Health, Safety & Environmental Incidents

- Minimal disruption to neighboring area

- On Time

- On Budget

- 97% Recycled